Hot Air Cycle Operation Car Tempering Furnace

Description:Hot Air Cycle Operation Car Tempering Furnace

Description

Hot air cycle operation car tempering furnace is composed by furnace body, car, heating device, and control system. Frame of the shell is welded by shaped steel. Both of the inner and outer walls are welded by cold rolled steel plate with the advantage of small deformation coefficient. The lining of the body and the door is aluminum silicate refractory fiber acupuncture cotton as the insulation layer that reduces the temperature of the furnace wall. The door also is the welded frame of steel. And the outer wall of the door is cold rolled steel too. The car is made of shaped steel with wheels on the bottom. The car can go into the furnace body and run flexible . Around the inlet of the furnace is embedded with rubber asbestos packing. When the door closed, the door and the rubber asbestos packing fit tightly to ensure that no heat distribution. Belt heating elements equipped on the both sides of the chamber are made of alloy of 0Cr25AL5 with ling service life.

PS:Our company can provide customized design according to user requirements.

台车式热风循环炉 (9).jpg

Supply Ability

  • 60 Set/Sets per Year

Packing & Delivery

  • The furnace is nude packed but duly fixed inside the container.
  • The nearest sea port is Shanghai port which is the largest and most convenient port over China.
  • The delivery time is 45-120 days after receipt of down payment.
  • The furnace is usually loaded into normal containers (20GP or 40GP) or flat racks.
  • Usually machine is packed with wooden case and standard export carton, plywood carton or as your requirement.

Our Services

  • Reply your inquiry within 48 working hours
  • Experienced engineer instruct and sales communicate with you in fluent English.
  • Exclusive and unique solution can be provided to our customer by our well-trained and professional engineers and staff.
  • More contact with users, communicate with each other, to ensure that the manufacturing products meet the needs of customers.
  • Production: strict quality standard, to produce machine and induction coils.
  • Installation on site and commissioning in the condition of cold and hot, to ensure the normal use.
  • Tracking goods shipping and provide bill of lading,invoice,packing list and other documents what you need.
  • Provide install and technology instruction by sending drawings, email, or telephone,video.
  • If you need, will arrange one engineer to your place,instruct install machine and training operators.
  • Responsible for free training of technology, service and operation personnel's theory, maintenance and operation skills, to make users use production right and expertly. Training is in the section of device debugging and test run.
  • After equipment final acceptance, quality guarantee period is for 12 months, the supplier replace and repair for free when the damage is caused by production and materials during the warranty period. To the damage out of warranty period, the supplier should give preferential service and the supply of parts (only accept costs), and provide lifelong offer after-sale service.
Hot Air Cycle Operation Car Tempering Furnace

Supply Ability

  • 60 Set/Sets per Year

Packing & Delivery

  • The furnace is nude packed but duly fixed inside the container.
  • The nearest sea port is Shanghai port which is the largest and most convenient port over China.
  • The delivery time is 45-120 days after receipt of down payment.
  • The furnace is usually loaded into normal containers (20GP or 40GP) or flat racks.
  • Usually machine is packed with wooden case and standard export carton, plywood carton or as your requirement.

Our Services

  • Reply your inquiry within 48 working hours
  • Experienced engineer instruct and sales communicate with you in fluent English.
  • Exclusive and unique solution can be provided to our customer by our well-trained and professional engineers and staff.
  • More contact with users, communicate with each other, to ensure that the manufacturing products meet the needs of customers.
  • Production: strict quality standard, to produce machine and induction coils.
  • Installation on site and commissioning in the condition of cold and hot, to ensure the normal use.
  • Tracking goods shipping and provide bill of lading,invoice,packing list and other documents what you need.
  • Provide install and technology instruction by sending drawings, email, or telephone,video.
  • If you need, will arrange one engineer to your place,instruct install machine and training operators.
  • Responsible for free training of technology, service and operation personnel's theory, maintenance and operation skills, to make users use production right and expertly. Training is in the section of device debugging and test run.
  • After equipment final acceptance, quality guarantee period is for 12 months, the supplier replace and repair for free when the damage is caused by production and materials during the warranty period. To the damage out of warranty period, the supplier should give preferential service and the supply of parts (only accept costs), and provide lifelong offer after-sale service.