Fiber Lining Crucible Sintering Furnace

Description:Advantages: the side wall of the furnace, the furnace door, the rear wall, the five surfaces of the top of the furnace are all the bulk of the fiber module. No gap, no heat, good sealing, no leakage, and every brick brick stove mullite has four slits..

Description

Advantages: the side wall of the furnace, the furnace door, the rear wall, the five surfaces of the top of the furnace are all the bulk of the fiber module. No gap, no heat, good sealing, no leakage, and every brick brick stove mullite has four slits, after running several thermal expansion and contraction, joint is more and more big, and both regenerative discharge temperature, invalid energy consumption is 10 times of the fiber module to 15 times, and also a curved arch roof of ineffective energy.

Heating element
The heating element is a flat belt type, by refractory corundum porcelain hanging nail fixed, there is a gap isolation and lining, the heat can be used to produce the heating element in the operation of the rapidly released into the furnace, the heating element is accumulated heat will not melt, all bend heating elements all can be fixed, and the heating element of mullite lining is a spring type, the middle can not be fixed, is likely to burn out due to short circuit.
Trolley
We have this car double track, the track of the buried foundation, and the horizontal plane, and by an electric motor constant, so there is no risk of collapse of the crucible table, left leg forklift clearance; and mullite stove is trackless, by manpower push and pull out, go to a small roller million the stones may be due to the collapse of the emergency stop crucible.
Fire door
The door is connected with the trolley through the handwheel, door seal in place, while at the same time car plug seal, and all of the soft soft seal, the effect is very good; and the mullite brick stove is hard to seal, brick uneven surface does not seal in place, it may depend on the discharge temperature, door head will the lower temperature, the temperature uniformity will be less.
Blower
With the furnace cooling speed is too slow, outside the furnace cooling speed too fast, we add a cooling fan on the back of the stove, diverted to the parts through the pipeline, and can through the air valve to control the cooling speed, effectively meet the process requirements, and mullite brick lined furnace even with the same function, but as long as there is a brick shed the heat, the cooling speed can be a lot slower, technology and efficiency, energy efficiency will be affected.

PS:Our company can provide customized design according to user requirements.

纤维衬坩埚烧结炉2.jpg

Supply Ability

  • 60 Set/Sets per Year

Packing & Delivery

  • The furnace is nude packed but duly fixed inside the container.
  • The nearest sea port is Shanghai port which is the largest and most convenient port over China.
  • The delivery time is 45-120 days after receipt of down payment.
  • The furnace is usually loaded into normal containers (20GP or 40GP) or flat racks.
  • Usually machine is packed with wooden case and standard export carton, plywood carton or as your requirement.

Our Services

  • Reply your inquiry within 48 working hours
  • Experienced engineer instruct and sales communicate with you in fluent English.
  • Exclusive and unique solution can be provided to our customer by our well-trained and professional engineers and staff.
  • More contact with users, communicate with each other, to ensure that the manufacturing products meet the needs of customers.
  • Production: strict quality standard, to produce machine and induction coils.
  • Installation on site and commissioning in the condition of cold and hot, to ensure the normal use.
  • Tracking goods shipping and provide bill of lading,invoice,packing list and other documents what you need.
  • Provide install and technology instruction by sending drawings, email, or telephone,video.
  • If you need, will arrange one engineer to your place,instruct install machine and training operators.
  • Responsible for free training of technology, service and operation personnel's theory, maintenance and operation skills, to make users use production right and expertly. Training is in the section of device debugging and test run.
  • After equipment final acceptance, quality guarantee period is for 12 months, the supplier replace and repair for free when the damage is caused by production and materials during the warranty period. To the damage out of warranty period, the supplier should give preferential service and the supply of parts (only accept costs), and provide lifelong offer after-sale service.
Fiber Lining Crucible Sintering Furnace

Supply Ability

  • 60 Set/Sets per Year

Packing & Delivery

  • The furnace is nude packed but duly fixed inside the container.
  • The nearest sea port is Shanghai port which is the largest and most convenient port over China.
  • The delivery time is 45-120 days after receipt of down payment.
  • The furnace is usually loaded into normal containers (20GP or 40GP) or flat racks.
  • Usually machine is packed with wooden case and standard export carton, plywood carton or as your requirement.

Our Services

  • Reply your inquiry within 48 working hours
  • Experienced engineer instruct and sales communicate with you in fluent English.
  • Exclusive and unique solution can be provided to our customer by our well-trained and professional engineers and staff.
  • More contact with users, communicate with each other, to ensure that the manufacturing products meet the needs of customers.
  • Production: strict quality standard, to produce machine and induction coils.
  • Installation on site and commissioning in the condition of cold and hot, to ensure the normal use.
  • Tracking goods shipping and provide bill of lading,invoice,packing list and other documents what you need.
  • Provide install and technology instruction by sending drawings, email, or telephone,video.
  • If you need, will arrange one engineer to your place,instruct install machine and training operators.
  • Responsible for free training of technology, service and operation personnel's theory, maintenance and operation skills, to make users use production right and expertly. Training is in the section of device debugging and test run.
  • After equipment final acceptance, quality guarantee period is for 12 months, the supplier replace and repair for free when the damage is caused by production and materials during the warranty period. To the damage out of warranty period, the supplier should give preferential service and the supply of parts (only accept costs), and provide lifelong offer after-sale service.