Gas Nitriding Furnace

Description:Pit type nitriding furnace with a new type of energy-saving lining has such advantages: heating up fast, less heat loss, furnace temperature uniformity, suitable for all kinds of parts nitriding treatment. A computer intelligent instrument can be equ..

Description

Pit type nitriding furnace with a new type of energy-saving lining has such advantages: heating up fast, less heat loss, furnace temperature uniformity, suitable for all kinds of parts' nitriding treatment. A computer intelligent instrument can be equipped. So the furnace temperature can be set according to the technical requirements, tracking displayed automatically, PLC program control achieved. Controlled by several temperature of gas nitrogen, upper and lower microcomputer networking, equipped with the manipulator can achieve the whole process of automatic control, recording and workshop group control and few people or no one operation. Equipped with inner nitriding tank, the workpiece without pollution.

PS:Our company can provide customized design according to user requirements.

气体氮化炉2.jpg

Supply Ability

  • 60 Set/Sets per Year

Packing & Delivery

  • The furnace is nude packed but duly fixed inside the container.
  • The nearest sea port is Shanghai port which is the largest and most convenient port over China.
  • The delivery time is 45-120 days after receipt of down payment.
  • The furnace is usually loaded into normal containers (20GP or 40GP) or flat racks.
  • Usually machine is packed with wooden case and standard export carton, plywood carton or as your requirement.

Our Services

  • Reply your inquiry within 48 working hours
  • Experienced engineer instruct and sales communicate with you in fluent English.
  • Exclusive and unique solution can be provided to our customer by our well-trained and professional engineers and staff.
  • More contact with users, communicate with each other, to ensure that the manufacturing products meet the needs of customers.
  • Production: strict quality standard, to produce machine and induction coils.
  • Installation on site and commissioning in the condition of cold and hot, to ensure the normal use.
  • Tracking goods shipping and provide bill of lading,invoice,packing list and other documents what you need.
  • Provide install and technology instruction by sending drawings, email, or telephone,video.
  • If you need, will arrange one engineer to your place,instruct install machine and training operators.
  • Responsible for free training of technology, service and operation personnel's theory, maintenance and operation skills, to make users use production right and expertly. Training is in the section of device debugging and test run.
  • After equipment final acceptance, quality guarantee period is for 12 months, the supplier replace and repair for free when the damage is caused by production and materials during the warranty period. To the damage out of warranty period, the supplier should give preferential service and the supply of parts (only accept costs), and provide lifelong offer after-sale service.
Gas Nitriding Furnace

Supply Ability

  • 60 Set/Sets per Year

Packing & Delivery

  • The furnace is nude packed but duly fixed inside the container.
  • The nearest sea port is Shanghai port which is the largest and most convenient port over China.
  • The delivery time is 45-120 days after receipt of down payment.
  • The furnace is usually loaded into normal containers (20GP or 40GP) or flat racks.
  • Usually machine is packed with wooden case and standard export carton, plywood carton or as your requirement.

Our Services

  • Reply your inquiry within 48 working hours
  • Experienced engineer instruct and sales communicate with you in fluent English.
  • Exclusive and unique solution can be provided to our customer by our well-trained and professional engineers and staff.
  • More contact with users, communicate with each other, to ensure that the manufacturing products meet the needs of customers.
  • Production: strict quality standard, to produce machine and induction coils.
  • Installation on site and commissioning in the condition of cold and hot, to ensure the normal use.
  • Tracking goods shipping and provide bill of lading,invoice,packing list and other documents what you need.
  • Provide install and technology instruction by sending drawings, email, or telephone,video.
  • If you need, will arrange one engineer to your place,instruct install machine and training operators.
  • Responsible for free training of technology, service and operation personnel's theory, maintenance and operation skills, to make users use production right and expertly. Training is in the section of device debugging and test run.
  • After equipment final acceptance, quality guarantee period is for 12 months, the supplier replace and repair for free when the damage is caused by production and materials during the warranty period. To the damage out of warranty period, the supplier should give preferential service and the supply of parts (only accept costs), and provide lifelong offer after-sale service.